Press Release

Nippon Express (Nederland) completes construction of Schiphol Airport Logistics Centre

Nippon Express (Nederland) B.V. (Masahiro Murakami, President; hereinafter, "NE Netherlands"), a local subsidiary of Nippon Express Co., Ltd. (Mitsuru Saito, President), has completed construction of its Schiphol Airport Logistics Centre in Schiphol Trade Park and held a ceremony on Thursday, July 15 to mark the occasion.

Situated in Schiphol Trade Park about 7km southwest of Amsterdam Schiphol Airport, a major European hub, the Centre offers twice the space of NE Netherlands' existing warehouse while being an eco-friendly facility with a 60m x 55m section of its rooftop covered in solar panels.

The newly opened location comes fully equipped with dedicated temperature-controlled spaces for pharmaceutical products that allow for storage in three temperature ranges - 15ºC to 25ºC (constant-temperature), 2ºC to 8ºC (refrigerated) and -15ºC to -25ºC (frozen) - as well as dedicated truck docks to better serve the logistics needs of customers in the pharmaceutical industry. Envisioning the need to handle heavyweight and long-length cargo such as semiconductor-related devices, ULD handling systems capable of processing 20ft pallets have been introduced with the aim of handling more large cargo items.

As it aims to expand its logistics services in the Netherlands with the establishment of this new Centre, NE Netherlands will be stepping up its efforts on behalf of the pharmaceuticals and semiconductor industries, both designated priority industries in the Nippon Express Group's business plan.

[Description of operations]
Import/export CFS operations for air/ocean cargo, removals, cross-docking operations

[Profile of new warehouse]

Name Nippon Express (Nederland) B.V. Schiphol Airport Logistics Centre
Address Contour Avenue 31,2133 LD Hoofddorp, The Netherlands
Structure One-story steel-reinforced concrete structure (office section: four stories)
Lot area 18,278m2
Total floor area 12,238m2
(Breakdown)
Warehouse area: 9,836m2 (including 315m2 of dedicated temperature-controlled pharmaceuticals storage space)
Office:2,261m2
Other:141m2
Principal equipment/facilities 19 truck docks, 2 ULD handling systems, complete CCTV coverage, solar panels, backup generator for temperature-controlled storage spaces
Start of operations Thursday, July 15, 2021